Bauart Architekten
Züri-Modular
2012
The Züri-Modular system follows on from the modular school constructions built in Thun. It was developed to address the needs of the city of Zurich for new schools and kindergartens. The wooden modules are produced in a workshop and subsequently rapidly assembled on the construction site. The modular system provides the possibility for future adaptations, extensions or displacements. To date, about thirty pavilions have already been built in various Zurich neighborhoods.












47°22'00.0"N 8°33'00.0"E
Location: Zürich, Switzerland
Type: Education, School
Posted: November 2019
Category: Architecture
Source
Location: Zürich, Switzerland
Type: Education, School
Client: Stadt Zürich, Amt für Hochbauten (AHB)
Timber Construction: Blumer-Lehmann AG, Gossau
Photography: Rasmus Norlander
Posted: November 2019
Category: Architecture
Source